BIM Application Process
- Gather information and involve client’s asset management team
- Actively provide support and solution to stakeholders
ENTERPRISE and PROJECT BIM
BIM Modeling & Coordination, Drawing and Rendering
BIM Modeling & Coordination:
3D model is the host of other building related information. The parametric model serves to improve accuracy, maintain project information integrity, and reduce time to iterate changes through the project. York Joint will develop a project parametric model to integrate, coordinate and help to document project disciplines including architecture, structure and MEP. If required, construction optimization studies conducted by the project construction team could later be incorporated into the BIM model by York Joint during construction stage. In this way, key design and fabrication constraints could be embedded into the BIM model, sources of conflict identified and managed, and real-time statistics on building material quantities and variation and building floor-plate areas generated.
Drawings:
York Joint establishes the best practice and methodologies for drawing extractions from the Master BIM Model, including 3D attributing methods, drawing extraction methodologies and additional model organization to support and enhance the data extraction workflow. York Joint will develop a process for drawing approvals by utilizing Project Collaboration Platform. Additional dictionaries and attributes set-up may be required.
Best practices and methodologies may be established to ensure a strict protocol for approvals. York Joint will further process 3D models data format specifically tailored to enable digital fabrication direct from 3D and attribute data. Export of data from the model for direct fabrication will be coordinated by York Joint.
Rendering:
York Joint fully supports the design team to present and demonstrate the design intent. York Joint’s professional visualization team will render visual graphics for the design and marketing. Graphical animation can be generated for display.
Clash Detection and Management Analysis
To fully use of BIM model, the BIM team will work closely with all disciplines. During the project process, BIM models in whole or parts will be published into a 3D dwf format file bi-weekly, such that the project team and concerned parties can easily view and understand the information. This will facilitate effective coordination and communications among BIM team and other consultants.
The BIM Manager would attend the project team monthly meetings and coordinate issues and response to requirements of the concerned parties. He would also control the quality of service, progress, as well as lead the BIM team to resolve technical problems, and conduct build ability and other relevant studies.
BIM Project Management
We provide entire BIM project management delivery service from Design, Construction, to Facility Management Stage.